Install Front and Top Caps

  1. Note: OPTIONAL: If your product does not include front shrouds, skip this step.
    Set front shrouds into the bottom cap. Install screws securing the front cap to the tower frame using a 10 mm wrench.
    Item Description Qty.
    1 Front Cap 1
    2 Front Shroud, Left 1
    3 Front Shroud, Right 1
    4 Screw, M6, HCS, 50 mm 4

    Tighten hardware to 16-20 in-lb (1.8-2.2 Nm).

  2. Install screws securing the front cap to the tower frame using a 10 mm socket wrench and ratchet.
    Note: Screw heads can be accessed from the top or bottom.
    Item Description Qty.
    1 Front Cap 1
    2 Screw, M6, HCS, 50 mm 4

    Tighten hardware to 16-20 in-lb (1.8-2.2 Nm).

  3. Press grommets into holes at the top of the tower frame.
  4. Install screws securing the tube caps to the tower frame using a Phillips screwdriver.
    Item Description Qty.
    1 Top Cap 1
    2 Tube Cap 2
    3 Screw, 8 x ¾" Phillips 2
    4 Grommet 2

    Tighten hardware to 10-13 in-lb (1.1-1.5 Nm).

  5. Press top cap down into the holes at the top of the tower frame.
  6. Select the appropriate language from the multilingual label sheet. Remove backing from multilingual label and apply to the front cap.
    Item Description Qty.
    1 Multilingual Label 1
    2 Front Cap 1