Cable Routing
- Route cable out through hole at the bottom of tower side tube. Route cable through the lower pulley assembly.
- Slide the carriage bolt to the end of the slot in the lower pulley assembly using a 17mm wrench.
- Install screws and washers securing the lower pulley assembly to the tower frame using an 8mm Allen wrench.
- Route cable through pulleys brackets on the main frame and work arm linkage assembly.
- Thread cable end through the jam nut and into the rod end bearing a minimum of 12mm.
- Install screw, washers, and locknut securing the bushings and rod end bearing to the work arm linkage assembly using an 8mm Allen wrench and 17mm wrench.

Tighten hardware to 20-25 ft-lb (27.1-33.9 Nm).


