Cable Assembly: Weight Stack
- Detach rear shroud from cable station.
- Loosen guide rod retainer screws.
- Detach and lower retaining rings.
- Remove guide rod retainers from cable station.
- Remove cable drive from cable station.
- Replace permanent guide rods for temporary guide rods.
- Add weight plates onto temporary guide rods.
- Replace guide rods.
- Replace cable drive onto cable station.
- Insert guide rod retainers into cable station.
- Raise retaining rings and clip onto guide rod retainers.
- Tighten guide rod retainer screws.
- Ensure cable has at least ½" (12.7mm) of thread engagement into the carriage. Then tighten jam nut.
- Ensure pulley weldment has at least ½" (12.7mm) of thread engagement into the headplate assembly. Then tighten jam nut.
- Adhere label over weightstack and peel off backing.
- Adhere labels over incremental weights.
- Attach rear shroud to cable station using rivets.
















