Cable routing

  1. Verify cable is routed through all pulleys.
  2. Route cable through top pulley bracket and then route cable end to top weight connector.
  3. Pull cable tight and secure in place with spiral pin using a 3/16” pin punch and a hammer.
    Description Qty.
    1 Spiral pin 1
    2 Cable 1
    3 Top weight connector 1
  4. Place weight stack selector pin in each plate to verify proper installation.
  5. Lift top weight up and down simulating normal operation (without selecting any resistance).
  6. Verify that the cable is moving smoothly and is routed straight from the pulley bracket to the top weight connector.