Weight Stack Assembly (from rear)
- Remove the top cap shroud from the Universal Cable frame by removing its hardware.
- Remove the hardware from both sides of the rear shroud.
- Pull the rear shroud from the left side, then the right side.
- Holding the flat section of the increment guide rod from spinning, remove the bottom increment weight hardware.
- Holding the flat section of the increment guide rod from spinning, remove the top increment weight hardware.
- Lift the increment guide rods up, then tilt back so the increment guide rods and increment weight assembly can be removed.
- Pull guide rod housings down, then tilt guide rods back so the guide rod housings and springs can be removed.
- With the cable still attached to the headplate assembly, slide the weight plates onto the guide rods.
- Place the springs between the guide rods and guide rod housings, then allow the springs to lock the guide rod housings into place.
- Reinsert the increment guide rods and the increment weight assembly.
- Holding the flat section of the increment guide rod from spinning, attach the top increment weight hardware and tighten to 40-50 in-lbs/ 4.5-5.6Nm.
- Holding the flat section of the increment guide rod from spinning, attach the bottom increment weight hardware and tighten to 40-50 in-lbs/ 4.5-5.6 Nm.
- Go back to step 1 of Weight Stack Assembly (from rear) and assemble the other weight stack assembly.
- Insert the rear shroud into the shroud support rails on both sides of Universal Cable.
- Attach the hardware on both sides of the rear shroud and tighten to 16-20 in-lbs/ 1.8-2.2 Nm.
- Replace the top cap shroud to the Universal Cable frame and tighten hardware to 16-20 in-lbs/ 1.8-2.2 Nm.










-6e50557e451075bd.png)
-f12ab702f53dc313.png)

