Assemble Tower
- Install the increment weight bumper to the bottom plate of the tower frame.
- Slide increment weight guide rods through the top of the tower frame and down through the clips in the increment weight. Place increment weight guide rods into holes at the bottom plate of the tower frame.
- Thread increment weight guide rods into the bottom plate of the tower frame. Tighten using a crescent wrench.
- Install nuts and washers securing the increment weight guide rods to the top plate of the tower frame using a 7/16" wrench.
- Route cable up through the top of the tower frame and down through the side tube of the frame.
- Install screws, washers, spacers, and nuts securing the pulleys to the top of the
tower
frame using an 8mm Allen wrench and a 17mm wrench.Note: Make sure the spacers are centered and inside the tube wall.

Item Description Qty. 1 Pulley, 3.5" OD 1 2 Pulley, 4.5" OD 1 3 Cable 1 4 Screw, M10 x 1.5, 55mm 2 5 Nut, M10 x 1.5, Hex Nylock 2 6 Washer, Flat 3/8" ID 4 7 Bushing 4
Tighten hardware to 14-16 ft-lb (19-21.7 Nm).Note: Make sure cable is routed over the pulleys and underneath the pins in the tower frame. - Flex rear shroud into position inside the tower frame.
- Starting at the top, press the shroud retainers into the rear shroud securing it to the tower frame.
- Install screws and washers securing the bottom cap to the bottom of the tower frame using an 8mm Allen wrench.
- Install screws and shroud retainer grommets into the side tubes of the tower frame using a Phillips screwdriver.
- Slide weight stack cushions onto the guide rods.
- Place guide rods with weight stack cushions into the holes at the bottom of the tower frame.
- Lean guide rods outwards and slide weight stack down guide rods onto weight stack cushions. Slide head plate assembly down guide rods and onto the weight stack.
- Tip guide rods back into an upright position in the tower frame. Compress guide rod housings onto the springs and guide rods and fit up into the top of the tower frame.
- Select the LBS (7.5) or KG (3.75) option of the increment weight cap. Press increment weight cap into the head plate assembly.
- Thread cable end through the jam nut and into the head plate bayonet. See Cable Handling Guide for details.
- Select either the LBS or KG weight stack label. Remove backing from label and apply to weight stack.
- Test the tower assembly.
- Route cable through pulleys brackets on the main frame.

















