Cable routing
- Place a small amount of Loctite® on BHSCS and inside threads of ball stop.
- Secure ball stop to cable using a 1/8” Allen wrench.
- Reconnect handle, pulley, and cable to adjusting posts on both sides.
- Position pulley mount parallel to the top weight.
- Pull down on pulley mount until cable is tight.
- Verify cable is still routed through all pulleys.
- Attach pulley mount to lifting post with spiral pin using a hammer and 3/16” pin punch.
- Lift top weight up and down simulating normal operation (without selecting any resistance).
- Verify the cable is moving smoothly.
