Cable routing

  1. Place a small amount of Loctite® on BHSCS and inside threads of ball stop.
  2. Secure ball stop to cable using a 1/8” Allen wrench.
  3. Reconnect handle, pulley, and cable to adjusting posts on both sides.
  4. Position pulley mount parallel to the top weight.
  5. Pull down on pulley mount until cable is tight.
  6. Verify cable is still routed through all pulleys.
  7. Attach pulley mount to lifting post with spiral pin using a hammer and 3/16” pin punch.
    Item Description Qty
    1 Cable 1
    2 Pulley bracket 1
    3 Roll pin 1
    4 Top weight connector 1
    5 Weight selector pin 1
  8. Lift top weight up and down simulating normal operation (without selecting any resistance).
  9. Verify the cable is moving smoothly.