Move to desired location

  1. Keep all shipping packages near area of installation.
  2. Remove foam and shrink wrap securing weight bar and weight tubes.
  3. Remove shipping cones using a 3/4" socket or wrench.
  4. Remove bolt from shipping cone with hammer. Recycle cone.
  5. Attach foot pads to each foot of frame.