Strength Systems
PWR Play
Assembly Manual
- Chapter 1: Overview
- 1.1: PWR Play Stations
- Chapter 2: Safety
- 2.1: Safety Information
- 2.2: Product Labels
- 2.2.1: Label Locations
- 2.2.2: Core (LPP-CORE)
- 2.2.3: Core Connector - Adjustable Cable Crossover (LPP-CX)
- 2.2.4: Core Connector - Accessory Storage (LPP-SX)
- 2.2.5: Adjustable Cable Crossbar (LPP-CB)
- 2.2.6: Adjustable Cable Crossover - Attached (LPP-CC)
- 2.2.7: Adjustable Cable Handle Storage (LPP-HR)
- 2.2.8: Adjustable 2:1 Cable (LPP-AC)
- 2.2.9: Adjustable 4:1 Dynamic Cable (LPP-AD)
- 2.2.10: Assisted Dip Chin (LPP-DC)
- 2.2.11: Dip (LPP-DI)
- 2.2.12: Dual Cable High (LPP-DH)
- 2.2.13: Dual Cable Low (LPP-DL)
- 2.2.14: Dual Cable Pulldown (LPP-DP)
- 2.2.15: Dual Cable Row (LPP-DR)
- 2.2.16: Power Pivot (LPP-PP)
- 2.2.17: Power Pivot - Rope Pull (LPP-PR)
- 2.2.18: Pulldown (LPP-PD)
- 2.2.19: Punching Bag Anchor (LPP-BA)
- 2.2.20: Rope Pull (LPP-RP)
- 2.2.21: Row (LPP-RW)
- 2.2.22: Stall Bars (LPP-SB)
- 2.2.23: Station Panel (LPP-PA)
- 2.2.24: Step (LPP-ST)
- 2.2.25: Triceps Pushdown (LPP-TP)
- 2.2.26: Versa (LPP-VA)
- Chapter 3: Components
- 3.1: Accessories
- 3.2: Cables
- 3.3: Hardware Kits
- 3.4: Head Plates
- 3.5: Increment Weights
- 3.6: Mid Mounts
- 3.7: Mid-Low Mounts
- 3.8: Low Mounts
- 3.9: Placards
- 3.10: Top Mounts
- 3.11: Top-Low Mounts
- 3.12: Top-Mid Mounts
- 3.13: Weight Stack Labels
- Chapter 4: Assembly
- 4.1: PWR Play Compatibility
- 4.2: Optional Front Shroud
- 4.3: MJ/PP Compatibility
- 4.4: Remove Increment Weight Selector
- 4.5: Tools Required
- 4.6: Assembly Order
- 4.7: Select Location
- 4.8: Install Top Mounts
- 4.9: Install Crossbar Connectors
- 4.10: Install Weight Stacks
- 4.11: Assemble LPP-HR
- 4.12: Install Mid Mounts
- 4.13: Install Low Mounts
- 4.14: Install Carriages
- 4.15: Install Cables
- 4.16: Install Labels
- 4.17: Install Panel Station
- 4.18: Install Hole Plugs
- 4.19: Install Snap Links
- 4.20: Cable Routing
- Chapter 5: Cable Handling Guide
- Chapter 6: Bolt to Floor Guide
- 6.1: Introduction
- 6.2: Bolt to Floor Prerequisite
- 6.3: Delivery and Installation Tips
- 6.4: Anchor Type - Dynamic
- 6.5: Anchor Specifications
- 6.6: Pullout Force
- 6.7: Tools Required
- 6.8: Anchor Procedure
- 6.9: Foot Dimensions