Assemble Leg Raise

  1. Remove and discard of the four shipping cones and hardware from base frame assembly.
    Item Description Qty.
    1 Jam Nut 1
    2 Nylon Washer 1
    3 Base Frame 1
    4 Shipping Cone 1
  2. Install elbow pads, high point facing out, onto base frame assembly with the 3/8" washers and M10 x 25mm screws. Tighten to 40-50 in-lbs (4.5-5.6 Nm).
    Item Description Qty.
    1 M10 x 25mm Screw 2
    2 3/8" Washer 2
    3 Elbow Pad 1
    4 Base Frame Assembly 1
  3. Gently tap plastic inserts into both sides of the base frame assembly.
    Item Description Qty.
    1 Base Frame Assembly 1
    2 Plastic Insert 6
  4. Install paint guards onto both sides of the base frame assembly with hardware and tighten to 8-10 in-lbs (0.9-1.1 Nm).
    Item Description Qty.
    1 Base Frame Assembly 1
    2 Paint Guard 1
    3 8 X 3/4 Pan Head Screw 6
  5. Gently tap 1" hole plugs into base frame assembly.
    Item Description Qty.
    1 1" Hole Plug 1
    2 Base Frame Assembly 1
  6. If desired, peel and stick label from the multi-language general warning sheet and carefully place over the English (default) label.
    Item Description Qty.
    1 Multi-Language General Warning Sheet 1
  7. Remove Bosu ball plug and fill using the supplied air pump to 9 inches (23cm) tall. If no air is required, gently tap bearing housing cap into Bosu ball assembly.
    Item Description Qty.
    1 Bearing Housing Cap 1
    2 Bosu Ball Plug 1