Assemble Leg Raise
- Remove and discard of the four shipping cones and hardware from base frame assembly.
- Install elbow pads, high point facing out, onto base frame assembly with the 3/8" washers and M10 x 25mm screws. Tighten to 40-50 in-lbs (4.5-5.6 Nm).
- Gently tap plastic inserts into both sides of the base frame assembly.
- Install paint guards onto both sides of the base frame assembly with hardware and tighten to 8-10 in-lbs (0.9-1.1 Nm).
- Gently tap 1" hole plugs into base frame assembly.
- If desired, peel and stick label from the multi-language general warning sheet and carefully place over the English (default) label.
- Remove Bosu ball plug and fill using the supplied air pump to 9 inches (23cm) tall. If no air is required, gently tap bearing housing cap into Bosu ball assembly.






